Re: how to use difference indicator in case of serial number in wm
If I look overall system then in the WM we don't have any parameter to carry forward the serial number hence serial number related correction need to be done at IM level Could you please share the...
View ArticleDefault 'subsystem items' checkbox checked during TO confirmation
Hello All, I am wondering if anyone suggest me if below requirement can be possible with some standard settings. We would like to have 'Subsystem items' checkbox checked by default for TO confirmation...
View ArticleRe: Default 'subsystem items' checkbox checked during TO confirmation
if you are talking about the header level item to subsystem option then it is not based on confirmation, it is based on creation and successful transmission of the TO detail to subsystem. check gets...
View ArticleRe: How to improve on material issuing?
my suggestion is to have a look on the standard SAP link first and if you are having any specific query then please let us know so that we can support...
View ArticleHUCANC
Hi, I'm doing partial GI against a process order from one HU via FM CO_HU_GOODS_ISSUE.Of course, each consumption creates one material document.Now, I'm trying to cancel several documents for the same...
View ArticleProcessing Idocs sequentially
Hello Experts, We receive Idocs for Message WMMBXY in our system. But we observe, the batch job(program, RBDAPP01) doesn't process this IDOCs sequentially. For e.g. IDOC 2 is processed first, and then...
View ArticleRe: Processing Idocs sequentially
Have you searched SAP Marketplace, I used 2 words to search: RBDAPP01 sequenceThe first hit was: 152239 - Sequence of IDocs when processing with RBDAPP01
View ArticleRe: HUCANC
if you have multiple material document for the same delivery then you can cancel the individual document using the material document option under VL09. please refer the solution proposed in the below...
View ArticleUncheck allow posting periods in MMRV automatically on particular date.
Hello All, I have one requirement We need to uncheck the check box "allow posting to previous period" automatically in MMRV on the date 5th of every month.Could you please let us know the...
View ArticleRe: WMS bin dimension problem with consignment stock (K)
Sorry, you are right, posting change not requirement.From LL01, I go to the posting change and try to create the TO in foreground (that will move from 922 U-ZONE to final bin).
View ArticleRe: WMS bin dimension problem with consignment stock (K)
Can you try to process the posting change notice from LU04
View ArticleRe: Change delivery qty after cancelling partial goods receipt inbound delivery
You can use LT01 to complete the WM steps without a TR, just check your stock overview and move the positive balance into your interim bin with a negative quantity. For the delivery quantity update...
View ArticleRe: WMS bin dimension problem with consignment stock (K)
This sounds as if SAP tries to add the own stock quantity earlier than removing the consignment stock .Can you show the customizing for movement type 411 (if any) from IMG ....Activities > Define...
View ArticleRe: Material Staging using 281 Network demand
Thank you Kamlakar for your response Apologies if unclear initially about the 2 SLocs You are correct, following the MF60 I processed the PCN so now my stock is in BBBB.To issue to reservation I use...
View ArticleRe: Material Staging using 281 Network demand
Hi Manish I am not getting an error message. I can successfully issue the stock to the reservation from AAAA but I have just staged the required stock to the production SLoc BBBB and I want to issue...
View ArticleRe: Material Staging using 281 Network demand
Hi Darren, What is the storage location in TR? It must be AAAA. Not sure why it is happening, but check WM-IM interface setting if you have set any standard storage location. Interface...inventory...
View ArticleRe: WMS bin dimension problem with consignment stock (K)
Hi Have you set 'posting to same bin' for WM movement type linked to 411 IM movement type? I guess this is happening because of above setting only. In this when you just create TO, you will still have...
View ArticlePropose destination bin for TO
For a putaway of a pallet, I want the system to propose the destination bin. Then I want the user to confirm this proposal before the TO is created. I can use L_TO_CREATE_MOVE_SU with the LENUMbut...
View Article